AV, C2 & Operational Workspaces
When coordination breaks down, mission response and essential services are exposed. Give authorized teams a clear operational picture and a dependable way to act.
Paragon Micro integrates AV and command workspaces for the Department of War, federal agencies, and public-sector organizations, shaped by mission continuity, information protection, and accountable delivery.
Explore technology partnersThe cost of losing coordination
When the room stalls, the mission feels it.
An unavailable command display can slow a watch team. Unclear audio can disrupt interagency coordination. A poorly planned cutover can interrupt a service the public depends on. Workspace design must account for those consequences before deployment.
Protect operational continuity.
Define essential functions, failure dependencies, recovery steps, and approved fallback workflows for the operating environment.
Respect information boundaries.
Align users, sources, display destinations, and collaboration paths with agency-approved access and handling requirements.
Make the investment defensible.
Connect equipment choices to documented needs, acceptance criteria, support capacity, and the cost of keeping the space operational.
Explore the connected workspace
Every layer serves
the operator.
Select a layer to see what it contributes to the environment and what to define in your design.
01 / Visualize
Get the right information into view.
Organize approved mission feeds, incident information, and service status around operator decisions. Make source identity and viewing permissions clear as information moves to shared displays.
- Readable displays for watch teams and briefings
- Approved source-to-display routing
- Source context and priorities during incidents
02 / Connect
Keep the conversation connected to the picture.
Support coordination between watch teams, agency leadership, incident partners, and remote sites. Match audio, video, and collaboration paths to approved platforms and operating conditions.
- Clear audio for operational coordination
- Accessible participation and remote-site needs
- Approved platforms and connectivity constraints
03 / Control
Give operators a clear next action.
Align source selection and room functions with watchfloor routines, leadership briefings, and incident response. Make permitted actions clear for operators working under time pressure.
- Role-appropriate controls and approved presets
- Clear feedback, handover, and recovery steps
- Control logic checked against mission scenarios
04 / Sustain
Plan for the shift after go-live.
Plan for extended shifts, component failures, and technology refreshes. Account for power, network dependencies, spares, and support responsibilities before the room becomes operational.
- Essential functions and degraded-operation needs
- Build records, spares, and support ownership
- Refresh timing and lifecycle budget planning
Different missions. Specific operating concerns.
Built around the people you serve.
Department of War
Command watchfloors, installation operations, and mission briefings. Prioritize shared awareness, approved information flows, shift handovers, and continuity when dependencies are disrupted.
Federal civilian agencies
Agency operations centers and interagency coordination. Plan for protected information, accessible participation, essential-service continuity, and documented acceptance.
State & local government
Emergency operations, public safety, transportation, and utilities. Support multiagency response, changing incident priorities, practical staffing, and constrained budgets.
Public-sector integrators
Connect the prime contractor, agency stakeholders, OEMs, and site teams around defined interfaces, security dependencies, delivery evidence, and handoff responsibilities.
Custom programming & system control
Complex systems.
Clear controls.
Operators should be able to change the room’s mode with clear, approved controls. We align custom programming with mission workflows, including environments using Crestron, Thinklogical, and other selected technologies.
Define permitted actions, operator roles, and recovery steps with the agency’s operational and security stakeholders. Validate those scenarios before the workspace enters service.
Discuss your control requirementsA coordinated technical scope
Connect the room.
Account for the system.
Bring operations, IT, security, facilities, and acquisition stakeholders into one defined technical scope.
Operational environment design
Align sightlines, operator positions, accessibility needs, and shift workflows with command, agency, or incident-response operations.
Visualization & source routing
Map permitted sources and viewing destinations so shared displays support awareness within the environment’s information boundaries.
Audio & collaboration
Coordinate approved voice and video platforms for local teams, remote sites, and authorized interagency participants.
Custom controls & programming
Define role-appropriate interfaces and presets for watchfloor operations, leadership briefings, and incident coordination.
Infrastructure & integration
Account for network separation, compute, power, service access, and recovery dependencies in the agreed system architecture.
Modernization & sustainment
Plan phased cutovers, configuration records, support responsibilities, and refresh costs around mission availability and funding constraints.
Powered by Trusted Technology Leaders
Bring the picture together.
Keep the team aligned.
Fragmented views. Unclear audio. Controls that slow the operator. Paragon Micro aligns technology partners across displays, signal routing, collaboration, networks, and power. Build around federal command-room workflows, authorized source access, and the operational continuity your team needs when the pace increases.
- Crestron
- Thinklogical
- Barco
- Extron
- Biamp
- Cisco
- Logitech
- Poly
- Neat
- Yealink
- LG
- Samsung
- Microsoft
- Dell Technologies
- Lenovo
- Intel
- NVIDIA
- Eaton
- APC
- HPE Aruba

Prepare the room before the pressure
Design for the mission.
Validate for the handoff.
Connect mission requirements, security review inputs, acquisition constraints, and test evidence to an accountable handoff.
Discover
Define essential functions, authorized users, site constraints, and acceptance criteria with agency stakeholders.
Engineer
Align interfaces, information boundaries, sourcing requirements, and lifecycle costs with the approved project scope.
Validate
Check routing, controls, interoperability, and agreed recovery scenarios. Record results for technical review and acceptance.
Transition
Plan the cutover, operator familiarization, configuration handoff, and support ownership around the operational schedule.
Paragon Micro’s System Readiness Center supports integration, staging, and validation before delivery. Discuss which parts of your workspace build can be prepared and tested in advance.
Explore the facilityDefine the details early
Questions worth asking before the build.
Can we modernize an active operational space?
Identify the functions that must remain available, permitted work windows, and dependencies of each change. Define phased cutovers, fallback steps, and acceptance checks around the watch schedule, incident readiness, or essential service being supported. Set operational responsibilities before work begins.
How should security and information boundaries shape the design?
Define authorized users, source systems, network boundaries, and information-handling requirements with the agency’s security stakeholders. Identify the design and test records needed for security review. Connections between security domains must follow an approved architecture; a room control system does not itself authorize information sharing.
What should we validate before accepting the room?
Use agreed mission scenarios: show an authorized source, change the operational view, include a remote site, hand over a shift, and recover from a defined fault. Include accessibility and operator usability checks relevant to the scope. Record the results against acceptance criteria.
How do acquisition and lifecycle constraints affect the design?
Define the intended acquisition path, applicable sourcing requirements, funding schedule, and support horizon early. Compare component availability, licensing, maintenance, spares, and refresh costs. Confirm contract applicability and required documentation with the responsible acquisition team.
Relevant past performance
Delivery experience
behind the design.
Explore published examples of communications, video infrastructure, and federal technology delivery.
Air Force / Tactical communications
2nd ASOS communications deployment
Delivered an integrated ruggedized networking, compute, storage, and power solution for the USAF in Vilseck, Germany, as a first-tier subcontractor to Huntington Ingalls Industries.
Navy / Video infrastructure
CNIC storage across 17 installations
Modernized camera-data storage for Commander Navy Installations Command. Two pilot installations informed the wider deployment, with hardware, licensing, support, and training included in the scope.
Federal civilian / Operational continuity
FBI emergency technology delivery
Delivered technology assets, including audio-video equipment and endpoints, to 75 FBI locations during the pandemic. The engagement included OEM coordination, asset tagging, and electronic asset records.
Match the experience to your scope. Discuss the project records and references relevant to your evaluation.
View all past performanceStart with the operational challenge
What must your team keep operational?
Bring us the command, agency, or public-service workflow your workspace must support, and the limitations that put coordination or continuity at risk.
We’ll help frame the next discussion around mission priorities, information boundaries, acquisition planning, and a practical path to delivery.
A useful starting point
- The mission, essential functions, and participating teams.
- The coordination problem and broad operating constraints.
- The project stage, acquisition timeline, and cutover window.
Discuss your workspace
Share public, unclassified, high-level project context only. Do not include classified information, CUI, credentials, or sensitive technical details.
If the form does not load, visit our contact page.


