Regional mission support

Every region.One mission standard.

From island sites in the Indo-Pacific to bases across the United States, Paragon Micro sizes, builds, tests, and delivers the IT each region needs, and supports it after delivery.

Engineered for the environmentTested before delivery
Illustration of connected mission technology infrastructure around the world.
Global reach. Regional understanding.
04Regions
44Base areas in the directory
342Listed sites, deduplicated
01Accountable technology partner

The regions

What each region needs

The threat and the distance change by theater, so the design changes too. Each region page covers the conditions, what we build, and the sites we work with.

  • 01 / UNITED STATES

    U.S. Northern Command (USNORTHCOM)

    United States

    Installation IT, power, and security at home

    FORTRESS America calls for every major installation to generate its own power and for bases to be hardened against cyber intrusion, sabotage, and drones. We deliver the control system security, video surveillance, and recovery behind it.

    Explore United States
  • 02 / EUROPE

    U.S. European Command (USEUCOM)

    Europe

    Deployable kits built for contested spectrum

    Jamming is the main way drones are lost in Ukraine, and command links face the same jamming. We build transit case kits with more than 1 path, store and forward edge nodes, and local compute.

    Explore Europe
  • 03 / MIDDLE EAST

    U.S. Central Command (USCENTCOM)

    Middle East

    Base networks that keep working after a hit

    Since February 2026, strikes have reached U.S. bases, drones have hit cloud data centers, and officials have threatened the cables under the Strait of Hormuz. We build a second node, local services, and an offsite copy of mission data.

    Explore Middle East
  • 04 / INDO-PACIFIC

    U.S. Indo-Pacific Command (USINDOPACOM)

    Indo-Pacific

    Dispersed island sites at the end of a few links

    Island sites depend on a few undersea cables that can take weeks to months to repair. We build local services, configured spares, and tested kits that keep a site running until the repair ship arrives.

    Explore Indo-Pacific

From requirement to readiness in every region

The steps are the same from Guam to Grafenwöhr. Distance, threats, and how long a site must run on its own change what goes into each one.

01

Assess

Theater, site & link conditions

02

Design

Architecture, OEMs & spares plan

03

Stage

Configured & staged before shipping

04

Test

Tested as a system before delivery

05

Field

Installed, trained & supported after

At a glance

44 Department of War base areas in 4 regions

This directory covers Department of War and National Guard installations and host nation sites. Each region page lists the ones we work with directly, grouped by area. Select a dot on the map or an area below to go straight to it.

  • 4Regions
  • 44Base areas
  • 342Installations and sites
  • Indo-Pacific
  • Europe
  • Middle East
  • United States

How we deliver to each region

We configure, stage, and test systems in our System Readiness Center, a 55,000+ square foot facility (NIST SP 800-171, AS9120). Then we ship them to bases in the United States and sites overseas, install them, train your team, and support them after.

See the facility

How to buy

Army organizations can order through ITES-4H. The Missile Defense Agency and other Department of War organizations can order through MDA SHIELD, and federal buyers can also use GSA. Starting in November 2026, any federal agency can also order through NASA SEWP VI. The right path depends on scope, eligibility, and ordering rules.

Other buyers and command areas

Buying for a federal civilian agency or as an integrator? See Federal Civilian Services or Federal System Integrators.

Supporting a site in another command area, such as U.S. Southern Command or U.S. Africa Command? Tell us the location.

Talk to our team

Hawaii appears on both the United States and Indo-Pacific pages and is counted once here.

Technology partners

We are a Dell Technologies Federal Platinum Partner, and we work multi-vendor, so each site gets the equipment that fits its mission.

See our partners

Regional analysis

What we have written about each region

Each article covers a condition from the region pages and what a base or unit can do about it.

Sources

Public sources as reviewed October 27, 2026. Each region page lists its full sources.

  1. Blanchard, B. (2026, April 30). Wreckage and weather sever Taiwan's undersea cable link to strategic island. Reuters, via Baird Maritime. https://www.bairdmaritime.com/marine-projects/marine-infrastructure/wreckage-and-weather-sever-taiwans-undersea-cable-link-to-strategic-island
  2. Pultarova, T. (2025, June 2). How Ukraine's killer drones are beating Russian jamming. IEEE Spectrum. https://spectrum.ieee.org/ukraine-killer-drones
  3. Gordon, C. (2026, March 27). US forces at Saudi air base suffer Iranian attack. Air & Space Forces Magazine. https://www.airandspaceforces.com/us-forces-saudi-arabia-iran-attack/
  4. Swinhoe, D. (2026, September 16). AWS "unable to restore access" to data centers hit by Iran strikes. Data Center Dynamics. https://www.datacenterdynamics.com/en/news/aws-unable-to-restore-access-to-data-centers-hit-by-iran-strikes/
  5. BERNAMA. (2026, October 20). IRGC cites seven internet cables under Strait of Hormuz, warns of 'new targets' [Anadolu report]. https://www.bernama.com/en/world/news.php?id=2622814
  6. Rev. (2026, September 30). State of the Force address [Transcript]. https://www.rev.com/transcripts/state-of-the-force-address

Insights

DoW analysis for every region we support

Our explainers on the Department of War programs behind new requirements in the Indo-Pacific, Europe, the Middle East, and the United States.

Explainer New

What Project Meridian means for DoW programs and the companies that supply them

Project Meridian has 120 days to study future warfare, with findings due to the Secretary's office by January 28, 2027. Our explainer covers who runs it, what it covers, and the develop, test, and field work programs and suppliers should plan for.

  • 6 chapters
  • Checklists and FAQ
  • APA sourced
Read the explainer

Analysis

Ready for the Autonomous Warfare Command: compute, comms, and data for unmanned operations

The new four star command has a target start date of October 1, 2027. Our guide covers what integrators, program offices, and advanced projects teams need at the edge, in the network, and in the data layer, plus the rules and contract vehicles that shape how it gets bought.

  • 6 chapters
  • Readiness checklists
  • APA sourced
Read the analysis

Guide

FORTRESS America: what independent bases need from their IT and security systems

FORTRESS America asks bases to make their own power and hold up against cyberattacks, sabotage, and drones. Our guide covers backup power and cooling, control system security, drone detection, and the chip and magnet rules behind base systems.

  • 6 chapters
  • Readiness checklists
  • APA sourced
Read the guide

Contact

Discuss your mission challenge

Connect with Paragon Micro to discuss infrastructure for your mission, secure operating environments, and resilient technology.

Our team will follow up to schedule a discussion.